Residential (Per Unit)
$4.00 to $4.15 effective 1/1/2026
Previous Rate Increase: January 2024
Readiness to Serve Charge
$15.00
Industrial (Per Unit)
$4.15 to $4.50 effective 7/1/2025
1 Unit - 100 Cubic Feet | 748 Gallons
$10.00
Rates / Fees
5/8" Meter Size
READINESS-TO-SERVE CHARGE WILL BE BASED ON SIZE OF METER
1" Meter Size
2" Meter Size
1 ½" Meter Size
$35.00
$20.00
$40.00
3" Meter Size
$45.00
Note: Industrial Meters will have an increased R.T.S. Charge
Additional Charges and Fees
Bad Check (Per Check)
$25.00
Transfer Fee (Per Account)
$40.00
Turn On/Off Fee Per Occurrence
$35.00
Relocate Meter
Fire Flow Test (Minimum)
$250.00
Construction Hydrant*
$1,500.00
*Monthly $150.00 plus $0.05 Per Gallon
Meter Testing
Fire Hydrant Installation
$150.00
QUOTE ONLY
By quote only; Prices vary based on location and job specs
1 Unit - 100 Cubic Feet | 748 Gallons
QUOTE ONLY
Late Fee
After Hour Available Times During Pump Runs
Times are Listed Below
During Weekends
8:00AM - 10:00AM
2:00PM - 4:00PM
7:00PM - 9:00PM
Weekday Evening
7:30PM - 9:30PM
Emergency Calls Are At No Charge.
Appointments Made During Pump Run Hours Are At No Charge.
Non-Emergency Calls Are $85.00 Minimum
Tri-City Mutual Water Company
6151 Heliotrope Ave,
Maywood, CA 90270